how to improve the success rate of meter reading methods and measures. Tenth, eleventh chapter explains in electronic energy meter performance testing in confusing error problem.
2013年9月9日星期一
On behalf of the transformer circuit breaker with bypass breaker operation
Double busbar three main segments with bypass wiring problems present a lot of 500kV Substation 220kV double busbar system uses three main segments with bypass wiring. This wiring 500kV substation in actual operation, on behalf of the transformer in the bypass breaker breaker protection on many occasions during the operation
mcb circuit breaker , operating personnel misuse of accidents, this is mainly due to the operation of the current
electric meter must be considered transformer (TA) circuit, the DC circuit, protection circuit and the outlet boot failure protection
Circuit breaker such as circuit switching, which switches on the operating personnel and the protection devices in high demand, especially in some less flexible protection switching, complicated operation , you can not fast operation.
订阅:
博文评论 (Atom)
没有评论:
发表评论