how to improve the success rate of meter reading methods and measures. Tenth, eleventh chapter explains in electronic energy meter performance testing in confusing error problem.
2013年9月22日星期日
Maximum output power distribution transformer, the starting period of time, the load torque becomes smaller
For pumping the load carried by the distribution transformer, the maximum load torque at the start, the maximum output power
Voltage stabilizer transformer, the starting period of time, the load torque becomes smaller, the output power distribution
mcb circuit breaker is greatly reduced. Therefore, in order to meet the requirements of pumping starter, left a large distribution transformer capacity margin. The transformer load is low rate of long-term working status, resulting in a waste of
power transformers capacity and active and reactive power losses, reducing the efficiency of the transformer, increasing the network loss. In order to reduce a pumping loss of power distribution transformers, it is necessary to use a start of pumping with a large capacity, in the normal operation pumping unit has a small capacity, the capacity to carry out the tone volume adjustment transformer.
订阅:
博文评论 (Atom)
没有评论:
发表评论