General provisions (a) actuator transported to the site of the inspection. 1) All actuator components,  mcb circuit breaker  and spare parts should be complete. 2) Actuator parts should be no rust, damage and moisture and other phenomena. 3) oil-filled, inflatable parts should be no leakage. (2) actuator transported to the site and the subsequent custody. A)  electric meter  shall its use be placed indoors or outdoors custody. 2) air compressors, valves should be placed indoors custody. 3) control box or organization should be properly kept me not damp. 4) custody, the response of the metal gear actuator friction member checks and protect against rust. (3) operating mechanism in the shipping and handling too.