how to improve the success rate of meter reading methods and measures. Tenth, eleventh chapter explains in electronic energy meter performance testing in confusing error problem.
2013年8月16日星期五
Installation of three-phase electrical degrees
1 meter at the factory inspection, and sealed letterpress printing, you can install and use. Lead seal or storage time is too long meter authorities should be invited to re-examination before installation.
2 Unpack the meter and found the original mcb circuit breaker or housing damage, do not install the power meter, power, please contact our technical service department.
3, installation meter need experienced electric transformer or professionals, and to determine reading the manual.
4, energy meter should be installed in ventilated, dry place indoors, using a variety of installation methods; 35mmDIN standard rail mounted or panel mounted fixed before.
5, in a filthy place and possible damage to the body, energy meter should be installed to protect cabinet.
6, the installation wiring should be in accordance with the meter cover side button or the instructions on the wiring diagram corresponding to the wiring diagram.
订阅:
博文评论 (Atom)
没有评论:
发表评论