how to improve the success rate of meter reading methods and measures. Tenth, eleventh chapter explains in electronic energy meter performance testing in confusing error problem.
页面
▼
2013年9月22日星期日
Adjust the tap should be first exit from the grid transformer
Distribution transformer no-load voltage regulation system, so adjust the tap should be first out of the transformer from the grid, to ensure that no power distribution
mcb circuit breaker , and make the appropriate security measures. (2) Unscrew the weatherproof cover the head screws, remove
power transformers . (3) before switching tap tap to see the location of each marker to distinguish gear. There are three general distribution transformers gear: 2 (Ⅱ) block represents the distribution transformer rated voltage, 1 (Ⅰ) distribution transformer block represents 105% of the rated voltage, 3 (Ⅲ) block represents 95% of the rated voltage distribution transformers .